Case study 08LondonRoof glazing
Bishops Square
Roof glazing refurbishment
The outcome
Eighteen months of day and night shifts on the roof, with the building below kept fully operational throughout.
Overview
Over an eighteen-month programme, our team of twelve carried out a full refurbishment of the roof glazing at Bishops Square, working day and night shifts to keep the building below fully operational.
Every sealant joint across the roof was cut out and replaced, and all pressure plates between the glazing units were renewed. Damaged glass panels were removed and replaced as part of the same works, restoring the roof to a fully weathertight condition.
Scope of works
- Complete removal and replacement of structural glazing sealant
- Replacement of all pressure plates across the roof glazing
- Replacement of broken glazing units
- Day and night shift working over 18 months
- Team of 12 operatives working at height on a live building