Case study 05LondonGlazed partitioning
100 Fetter Lane
Glazed screen partitioning
The outcome
Glazed screens lifted in panel by panel and handed over fully glazed, to the client’s quality standard.
Overview
This project involved the installation of a glazed screen partitioning system at 100 Fetter Lane, London, for Mace. OMFC International was engaged to install the glazed screens throughout the workspace, using specialist vacuum lifting equipment to position each panel safely and precisely.
OMFC International’s qualified installation team carried out the works from initial panel handling and crane-assisted lifting through to the final, fully glazed screen partitioning, delivering the completed installation to the client to the highest standard of quality and finish.
Scope of works
- Installation of glazed screen partitioning throughout the workspace.
- Safe handling and positioning of glazing units using specialist vacuum lifting crane equipment.
- Setting out and fitting of screen framing and glazing to specification.
- Coordination with the wider Mace site programme.
- Deployment of a qualified, certificated OMFC International installation team.
Installation process
The photographs below show the OMFC International team on site handling, lifting and positioning the glazed screen panels using vacuum lifting equipment, ahead of final fitting.
Completed result
The completed glazed screen partitioning was delivered to the client to the best quality, providing a clean, fully glazed finish throughout the workspace.